Hydrologic / Hydraulic Analysis and Gate / Pump Optimization Study for Clear Creek Watershed

Share Hydrologic / Hydraulic Analysis and Gate / Pump Optimization Study for Clear Creek Watershed on Facebook Share Hydrologic / Hydraulic Analysis and Gate / Pump Optimization Study for Clear Creek Watershed on Twitter Share Hydrologic / Hydraulic Analysis and Gate / Pump Optimization Study for Clear Creek Watershed on Linkedin Email Hydrologic / Hydraulic Analysis and Gate / Pump Optimization Study for Clear Creek Watershed link

STATEMENT OF WORK

Proposed Tasks:

1. Review the Coastal Texas Protection and Restoration (Coastal TX) Study by USACE and TX-GLO for Clear Creek watershed

2. Baseline hydrodynamic model setup and scenario analysis

3. Pump station and gate scenario analysis and optimization

Study

Objective

Investigate the flood impacts of the proposed gate and pump station on Lower Clear Creek watershed and evaluate potential configuration options for further flood mitigation

STATEMENT OF WORK

Proposed Tasks:

1. Review the Coastal Texas Protection and Restoration (Coastal TX) Study by USACE and TX-GLO for Clear Creek watershed

2. Baseline hydrodynamic model setup and scenario analysis

3. Pump station and gate scenario analysis and optimization

Study

Objective

Investigate the flood impacts of the proposed gate and pump station on Lower Clear Creek watershed and evaluate potential configuration options for further flood mitigation

  • Task 1

    Share Task 1 on Facebook Share Task 1 on Twitter Share Task 1 on Linkedin Email Task 1 link
    supporting image



    TASK 1: REVIEW COASTAL TX STUDY

    Focus on the Clear Lake gate and pump system

    • 75-ft floating sector gate for boat traffic
    • Circulation gates for water quality and tidal flow exchange
    • Pump station with 20,000 cfs capacity
    • 17-ft floodwall




    loader image
    Didn't receive confirmation?
    Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
    Submitting your comment
    Cancel
  • Task 2

    Share Task 2 on Facebook Share Task 2 on Twitter Share Task 2 on Linkedin Email Task 2 link
    supporting image

    TASK 2: BASELINE HYDRODYNAMIC MODEL

    Baseline model setup

    • HEC-RAS 2D model of Lower Clear Creek and Armand Bayou watersheds
    • HCFCD Map and Model Management (M3) models used as reference
    • Baseline model validated / calibrated against recent historical storms (e.g., Harvey 2017, Beryl 2024)





    Baseline scenario analysis

    1. Surge-only scenarios: 100-yr, 500-yr storm surge
    2. Precipitation-only scenarios: 10-yr, 25-yr, 100-yr, 500-yr rainfall
    3. Compound scenarios: select combinations of a and b
    loader image
    Didn't receive confirmation?
    Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
    Submitting your comment
    Cancel
  • Task 3

    Share Task 3 on Facebook Share Task 3 on Twitter Share Task 3 on Linkedin Email Task 3 link
    supporting image

    TASK 3: GATE AND PUMP STATION OPTIMIZATION

    Based on findings from Task 2, select gate and pump station configurations will be evaluated.

    • Performance metrics: floodplain extent, number of structures / residential properties flooded, flood depth at critical facilities / watch points
    • Operation of pumps and gates during a storm (e.g., Harvey 2017)
    • Optimize number of pumps and their capacities for targeted flood reduction


    loader image
    Didn't receive confirmation?
    Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
    Submitting your comment
    Cancel
Page last updated: 26 Aug 2025, 12:34 PM